TEKNOMER 100, BINNEN BUITEN, GRIJS 20KG
Your shopping cart is empty!
Product Description
Cement based, single component, applied to concrete mixture or concrete surfaces, crystallized
structure waterproofing material that reacts with water coming from the concrete.
Areas of Usage
Features and
Benefits
Application
lnstructions
• Elevator pits,
• Water storage, swimming and ornamental pools,
• Reinforced concrete pipes,
• As a concrete additive that provides crystallized insulation during concrete casting,
• in the ruin and infrastructure materials,
• Basically, on the basement walls,
• in engineering constructions such as metro, tunnel, dam, highway,
• it is used for negative and positive water insulation of buildings like basement walls.
• The crystallization feature effectively prevents the passage of water from the surface.
• Resistant to positive and negative water pressure.
• it is easy to use, mixed with plain water and used.
Surface Quality: The surfaces must be clean, smooth, solid, free from any antiadhesive substance
such as dust, oil, dirt, rust, mold oil, detergent and waste. in case of segregation in concrete, it should
be discarded and loose parts should be removed, weak parts should be removed. lf there is crack,
hollow on the floor or wall to be applied, it should be repaired with appropriate TEKNOREP repair
mortars. TEKNOMER 100 application should be started 3-4 days later.
Make sure that the slab or concrete is thrown in the direction of the water stream. The correct control of
the curve is made in the following way. Beginning from the beginning to the gauge, put a scale on it. lf it
is determined that there is no inclination or reverse slope in the control result, the application should not
be started and the direction of the water flow should be adjusted by performing concrete and slab
treatment. lf necessary, additional screed or concrete must be poured.
Surface Preparation: lf the surface to be insulated is dry, it should be wetted and ready to be applied to
the water.
6,0-7,0 it clean, clear water received from normal ambient temperature into a clean container which is
free from all kinds of materials which prevent adhesion. The powder is in the vessel filled with water and
the Teknomer 100, which is in the 20 kg bag, is emptied. The product is mixed with a low speed mixer
until a homogeneous mixture without lumps is obtained. Mixing time should be at least 5 minutes, the
mortar obtained at the end of the process should be rested for 3 min. and mixed again until it becomes
homogenous for 2 min.
The application ofTEKNOMER100 is done in three ways;
• By brush: On dry floors, the concrete surface is moistened and saturated with water. There may be
moisture on the surface, not condensation or ponding. lf there is continuous water, leakage should be
stopped with TEKNOPLUG. Then the prepared mixture is applied to the surface 2-3 times with brush.
Application can be made by hard bristle brush or mechanical spraying method. The application is
completed from first left to right, second to top down. The waiting time between floors is as follows.
When the concrete floor is checked manually, if the TEKNOMER 100 does not leave a mark, the other
layer can be applied.
• Hand Sprinkle Method: TEKNOMER 100 is sprinkled on the grobeton before the concrete is poured.
Depending on the demand TEKNOMER 100 Then concrete is poured.
• The admixtures may be batched in either a central or truck mixer . For most applications, the
recommended dosage of Teknomer 100 admixture is as %2-3 by mass of cement. It is mixed for
3-5 minutes. Preliminary testing is recommended for different kinds of applications.
calculator
Totale vierkante meter die u nodig heeft: m²
Totaal doos dat u nodig heeft: pak
When you order from dcbouw.shop, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.
The total time it takes to receive your order is shown below:
The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.
Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.
Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.
Shipping from your local warehouse is significantly faster. Some charges may apply.
In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!